Case Study #1

Installation, Integration and Commissioning of PWS Siren

Making measurement

Men at Works

Erecting siren pole mounting and support

Installation of siren cabinet

Erection of siren Horns and Drivers

Termination works at Siren Head

Siren Installation Completed

Case Study #2

‘Turn‐Key’ Installation Works at Port Operation Control Centre:‐
Installation works include setting up of cable support system for Power & Data cables, routing and termination of all power & data/control cables, racking up of various System’s equipment racks, setting up of Operator’s Console Working Position, delivery and installation of Uninterruptible Power Supply system, support of Site Acceptance and Warranty phase.

Case Study #3

Installation of VHF Radio Station, and integrate into Maritime Communication System

Case Study #4

Installation of Video‐Wall Display System, and Maintenance Training

At Training – in full concentration